For Manufacturing a item where the flow we need to be started first and It will be more helpful if there is any documentation or video tutorial for manufacturing.


Thanks
  • Anonymous
  • 2017-07-06 15:14:14
1. Create all the items (materials in SAP terms and Item in Oracle terms)
2. Create the BOM (and Routing if you wan to track cost and lead time)
3. Create a Work Order
4. Release the work order for production
5. Move the Work order from one operation to another operation till the last operation
- During this process system automatically issues materials and resource as per the WO (which defaults values from bom and routing)
6. If any extra material or resource is used (on top the default values in BOM and Routing) then manually issue them to the work order
7. Complete the work order
8. Close the work orderReply
 Per Page
  •   Select File
  • Reply as
  •   Subscribe

All inoERP code is Copyright by the Original Authors as mentioned on COPYRIGHT.txt file.
inoERP is an open Source software; you can redistribute it and/or modify it under the terms of the Mozilla Public License Version 2.0